RESIDENTIAL PROJECTS
Parc Telegraph HOA
Challenges:
In addition to the visual concerns and normal re-roofing challenges, access to the roof was difficult at best. Because of the building height, stepped design at the rear of the building and limited parking space, it was determined it was not feasible to use a crane for material loading. The only available option for unloading the roofing materials was a narrow 20 foot wide alley … Read More.